- Error code
- 30 codes
- Category
- AC overcurrent
- Manufacturer
- REFUsol
1What the error means
The following error codes of REFUsol inverters belong to the same fault family: over-current. Find the code shown by your inverter in the table and see what it means.
2Possible causes
- Sudden change or short circuit on the grid
- Fault in the power bridge
3What to do
- Check the AC connection and the grid.
- If it returns with no external cause, the power stage needs to be checked in our lab.
The codes in detail
| Code | What it means |
|---|---|
| 0x090070 | Over-current in one of the strings |
| 0x0A0119 | The current transducer detected no current flow at all |
| 0x0A0161 | Over-current in the boost circuit — hardware shutdown. |
| 0x0A0162 | Over-current in the boost circuit — hardware shutdown. |
| 0x0A0163 | Over-current on phase U — hardware shutdown |
| 0x0A0164 | Over-current on phase V — hardware shutdown |
| 0x0A0165 | Over-current on phase W — hardware shutdown |
| 0x0A016B | Over-current on string 1 |
| 0x0A016C | Over-current on string 2 |
| 0x0A016D | Over-current on string 3 |
| 0x0A016E | Over-current on string 4 |
| 0x0E0001 | Over-current on phase L1 1 |
| 0x0E0002 | Over-current on phase L2 1 |
| 0x0E0003 | Over-current on phase L3 1 |
| 0x0E0005 | Over-current on phase L1 2 |
| 0x0E0006 | Over-current on phase L2 2 |
| 0x0E0007 | Over-current on phase L3 2 |
| 0x0E0009 | Over-current on phase L1 3 |
| 0x0E000A | Over-current on phase L2 3 |
| 0x0E000B | Over-current on phase L3 3 |
| 0x0E0024 | Over-current on the DC side |
| 0x0E0035 | Over-current detected |
| 0x0E0036 | Over-current detected |
| 0x0E0050 | Over-current detected |
| 0x0E0051 | Over-current detected |
| 0x0E0052 | Over-current detected |
| 0x0E0053 | Over-current detected |
| 0x0F0104 | Grid disturbance (stability, inrush current or load) |
| 0x0F0105 | Grid disturbance (stability, inrush current or load) |
| 0x20004 | The grid current exceeded the maximum limit on one of the three phases |
4Repair by Aineas
You send the inverter to our lab in Thessaloniki. We diagnose it, inform you of the fault and the cost, and the repair starts only after you approve it. Every inverter is tested under simulated operating conditions before delivery.
